-
Abu Dhabi to tender Mid Island Parkway phase two in 2025
The second phase of the project includes the construction of a highway stretching over 11 kilometres22 December 2024, 08:00Source: UAE MEED
-
Post-prequalification begins for UAE high-speed rail
The first phase involves the construction of a railway line connecting Abu Dhabi and Dubai, which is expected to be operational by 203022 December 2024, 08:00Source: UAE MEED
-
Taqa to award Dhafra open-cycle gas power plant contract
The power plant project supports the UAE’s artificial intelligence strategy22 December 2024, 08:00Source: UAE MEED
-
Taqa to bid for GS Inima
The sale of the firm is estimated to be valued between $836m and $1.4bn19 December 2024, 08:00Source: UAE MEED
-
UAE: Switchgear panel, earthing system and motor maintenance
Maintenance of switchgear panels, earthing system and motors19 December 2024, 08:00Source: UAE MEED
-
Ellington awards $163m villas construction deal
The deal was awarded for the Sanctuary villa community located within Mohammed Bin Rashid City in Dubai19 December 2024, 08:00Source: UAE MEED
-
EDF eyes 5GW UAE hydropower plant
The project is envisaged to store energy for up to 12 hours09 December 2024, 08:00Source: UAE MEED
-
Opec+ delays oil output hike until April
The planned full unwinding of oil production cuts by a year until 2026-end has also been postponed09 December 2024, 08:00Source: UAE MEED
-
UAE: Break pressure tank
Replacement of an old defective break pressure tank09 December 2024, 08:00Source: UAE MEED
-
Adnoc could potentially float additional Adnoc Gas shares
The Abu Dhabi energy, which currently holds the majority 90% shares in Adnoc Gas, has not ruled out listing more shares in its gas processing subsidiary on ADX in future30 November 2024, 08:00Source: UAE MEED
Email: info@TO-LET.AE